The UK Ministry of Defence is seeking industry engagement for the HLC Ph2 acceleration programme. This initiative aims to develop 100kg and 200kg payload lift capabilities for Intra-Theatre and Inter-Theatre operational use cases.
AI summary of the notice · the full notice text is below
In order to stimulate the 100kg lift Unmanned Aerial System (UAS) market, the Future Capability Group (FCG) and the Royal Navy Office of Chief Technology Officer (OCTO) delivered a programme called the Heavy Lift Challenge (HLC) in 2021/22 at Predannack Airfield, Cornwall. Two companies were funded to accelerate their platform capabilities towards a Minimum Viable Product (MVP) of 200kg. This investment allowed The Authority to identify 2 potential operational use cases; these being: - Intra-Theatre Lift (ship to ship replenishment and littoral ship-to-shore resupply) - Inter-Theatre Lift (shore to ship & return) The Authority is now looking launch HLC Ph2 in order to broaden its investment in these 2 potential operational use cases that will intend to be as follows (but not limited to and not yet fully defined as):- 1. Intra-Theatre Lift:- entry 100kg; MVP 200kg; Stretch 300kg payload lift over entry 5nM; MVP 10nM; Stretch 50nM (nautical miles) 2. Inter-Theatre Lift:- entry 50kg; MVP 75kg; Stretch 125kg payload lift over entry 150nM; MVP 300nM; Stretch 550nM (nautical miles) This notice is to invite industry who have mature systems in either of these 2 main areas to attend the HLC Ph2 Industry Engagement Day at i-Aero in Yeovil on the 5th July 2022 (timings TBD). Industry attendance will be limited to 2 attendees per company. To register attendance for the industry day, provide names of attendees Via the Defence Sourcing Portal and at the time of submission, must confirm they have a system that meets either minimum entry criteria of payload lift of 100kg over 5nM OR 50kg over 150nM AND can fly in Aug 22 (location TBD). To do this, please supply a product data sheet. Deadline for confirmation of attendees by no later than 1200hrs on 1 Jul 22. You will be informed if we do not deem your product to be suitable for HLC Ph2. The aim for this day is to engage the market on the forthcoming HLC Ph2 acceleration programme which will start in August 22. The following will be
The Drone Procurement Radar: new drone tenders and awards with time left to bid, once a week. Unsubscribe any time.
The facts on this page come from the official notice. 7 other sources add to it.